« Notes on Scale | Main | Setting Expectations for Contribution Based Projects (Part 1) »
TrackBack URL for this entry:
http://www.zefrank.com/mt/mt-tb.cgi/35
This page contains a single entry from the blog posted on January 24, 2009 3:44 PM.
The previous post in this blog was Notes on Scale.
The next post in this blog is Setting Expectations for Contribution Based Projects (Part 1).
Many more can be found on the main index page or by looking through the archives.